Sample panel - data is illustrative. For your own boat's panel, request a free introductory check.
← Sample panel

Teak deck caulking renewal

Quote #T-2047 · v2 · Valid until: 15 February · Prepared by: Murat (operations)

Awaiting your decision

v2 (10 Jan): material line corrected - confirmed as Sikaflex-290i DC · the v1 (08 Jan) record is retained

Why is this work recommended?

The January check found opening and hardening in roughly 40% of the deck seams. Teak that takes on water through open seams passes damp into the plywood beneath. (finding #F-311)

If left undone: Damp works into the substructure; next season the cost can rise to a localised teak replacement (~3-4 times as much).

Seam opening · cockpit port side
Seam opening · cockpit port side
General view · 26 Jan
General view · 26 Jan

How was this quote chosen?

Quotes were gathered from 3 workshops; 2 were ruled out for not meeting the Care standard. You are only offered what passes the standard - the burden of negotiation and choosing a craftsman isn't yours, it's ours.

Care work standard and elimination record View

Minimum standard for this job: ≥ 12-month written warranty · seam depth ≥ 6 mm · manufacturer-approved caulking compound · insured work · a quality-control track record on reference jobs.

Ruled out 1 - lowest-priced quote: 6-month warranty, 4 mm seam → risk of reopening within 1-2 seasons; cheap short-term, expensive overall.

Ruled out 2: same scope and warranty, 16% higher price; no technical justification for the difference.

Selected - A.K. Woodworking Workshop: their last 11 teak jobs passed our quality control first time; they have no partnership with GöcekOnline.

Elimination records are kept in the audit file; if you wish, you can review them in detail with your operations manager.

History: #T-1988 Deck vinyl covering - you declined it on 12 Dec · the record is retained

Scope options

Why we recommend this: Because the opening has reached 40%, a partial repair comes back within 1-2 seasons with fresh openings; renewing the whole deck in one go means you don't pay for repeated labour.

Price breakdown - Full renewal

Labour - caulking removal + renewal (14 m²)Craftsman: A.K. Woodworking Workshop · 6 working days1,150 €
Material - deck caulking compoundSika Sikaflex-290i DC · 18 cartridges · invoice attached396 €
Sanding + surface preparation consumables64 €
Care coordination feePlanning, supervision, quality control120 €
Travel / crane / marina120 €
Total (VAT included)1,850 €
Warranty: 24 months - if seam opening recurs it is renewed free of chargeDuration: 6 working days (±1 day depending on the weather - you are told if there is a delay)Excluded: repairs requiring deck hardware removal; if found, a separate quote is presentedCraftsman: A.K. Woodworking Workshop - no partnership with GöcekOnline; the quality control is ours

Not recommended: We didn't recommend: a full deck replacement (-6,400 €) - the existing teak is sound for another 8-10 years.